RoboTech Engineering

Team 'MusselMen': Autonomous Bio-Robotic Ocean Cleanup System

🏆 1st Place Winner - Solidworks Design; 🏆 2nd Place - Hackathon winner

🏆 Most Creative Project award by Texas Instruments

About The Hackathon

RoboTech is a premier annual engineering hackathon that challenges teams to develop innovative, sustainable solutions to pressing global problems. The competition emphasizes original design and entrepreneurial thinking, requiring all solutions to be developed from scratch within 36-hours.

Time Limit 36hrs
Date April 2022
My Role Team Lead
Team Size 3 Engineers

Key Technologies

Design:
Solidworks
Strategy:
Business Pitch Strategic Communication Market Analysis Stakeholder Engagement
Business:
Cost analysis Product lifecycle Partnership Development

1The Challenge & Solution

Developing innovative bio-robotics for large-scale ocean remediation

The Challenge

  • Oceanic microplastics have reached alarming concentrations, contaminating marine ecosystems and entering the human food chain through bioaccumulation
  • Existing cleanup technologies are prohibitively expensive and geographically limited in their operational scope
  • The scale and urgency of microplastic pollution demands a cost-effective, scalable solution with broad coverage capabilities
  • Projected microplastic concentration trends. Source: Kyushu University

Our Solution

  • Leveraged mussels' natural biofiltering capabilities to extract microplastics from seawater through biological processes
  • Engineered an autonomous solar-powered robotic buoy system that transports mussel colonies across oceanic regions for continuous water purification
  • Developed a comprehensive 3D prototype model with detailed engineering specifications to demonstrate technical feasibility
  • Conducted extensive research on mussel biofiltration mechanics, operational scalability, and deployment logistics
  • Designed swarm robotics protocols enabling coordinated fleet operations and inter-robot communication systems
  • Created a comprehensive business strategy targeting Pacific Ocean deployment within three years, including identified funding sources and strategic partnerships
View Official Competition Submission →

2Key Achievements & Impact

Demonstrating scalable environmental solutions through innovative bio-robotics

10,000$
Cost to build for each robot
297,000
Gallons of water filtered daily per robot
BioInspired
Sustainable and ethical design leveraging natural filtration processes

Technical Deliverables

  • 3D Engineering Design: Complete SolidWorks assembly with technical drawings, material specifications, and structural analysis
  • Business Strategy: Comprehensive go-to-market plan with three-year ocean deployment roadmap and operational framework
  • Strategic Partnerships: Identified key sponsors including NOAA and developed funding acquisition strategy
  • Team Leadership: Successfully coordinated cross-functional engineering team to deliver integrated solution under extreme time constraints through effective task delegation and project management

3Technology & Tools

Advanced technologies employed in this project

Design & Engineering
SolidWorks CAD
3D Modeling
Technical Drawing
Material Analysis
Structural Engineering
Systems Engineering
Robotics Design
Solar Power Systems
Marine Engineering
Bio-Integration
Autonomous Navigation
Communication Protocols
Business Development
Strategic Planning
Financial Modeling
Market Research
Stakeholder Management
Partnership Development
Technical Presentation